海勃湾枢纽对坝后河道冲淤的影响 |
| 陈琼, 刘晓民, 刘廷玺, 张红武, 刘国峰, 王文娟 |
|
Influence of construction and operation of the Haibowan Junction on the downriver channel erosion and deposition |
| Qiong Chen, Xiaomin Liu, Tingxi Liu, Hongwu Zhang, Guofeng Liu, Wenjuan Wang |
| 图10 2004—2020年冲淤量沿程变化 |
| Fig.10 The variation of erosion and deposition along the river from 2004 to 2020 |
|