库木托拜沙漠公路风沙-风雪复合灾害的形成机制及治理方案 |
||||||||||||||||
李生宇, 丁刚, 王世杰, 赵亚洲, 徐新文, 郑婷婷, 武新成 | ||||||||||||||||
Formation mechanism and control scheme of the compound disaster of blown sand and snow drift on the Kete Highway in the Kumtoba Desert in Xinjiang, China |
||||||||||||||||
Shengyu Li, Gang Ding, Shijie Wang, Yazhou Zhao, Xinwen Xu, Tingting Zheng, Xincheng Wu | ||||||||||||||||
表2 气温低于-6 ℃时10 m 高度不同粒径雪粒的起动风速(引自文献[ |
||||||||||||||||
Table 2 Threshold wind velocity of snow particles with different particle sizes at height of 10 meters when the temperature is below -6 ℃ (Quoted from Literature [19]) |
||||||||||||||||
|
||||||||||||||||