荒漠草原区风力发电场建设前后的植被变化

马松尧1, 陈龙1, 滕泽宇2, 丁爱军2, 何子豪3   

  1. 1. 甘肃自然能源研究所, 甘肃 兰州 730046;
    2. 中国科学院西北生态环境资源研究院, 甘肃 兰州 730000;
    3. 甘肃大唐新能源有限公司, 甘肃 兰州 730070
  • 收稿日期:2019-01-15 修回日期:2019-01-28 发布日期:2019-04-11
  • 通讯作者: 陈龙(E-mail:longchenfly2013@163.com)
  • 作者简介:马松尧(1964-),男,甘肃宁县人,博士,研究员,主要从事生态经济研究。E-mail:masongyao@163.com
  • 基金资助:
    甘肃省科学院与中国科学院合作项目(2017HZ-01);甘肃自然能源研究所青-科技创新计划项目(2018QN-02);国家重点研发计划重点专项(2016YFC0501001)

Vegetation Changes in Wind Farm in Desert Steppe Region

Ma Songyao1, Chen Long1, Ten Zeyu2, Ding Aijun2, He Zihao3   

  1. 1. Gansu Natural Energy Research Institute, Lanzhou 730046, China;
    2. Northwest Institute of Eco-Environment and Resources, Chinese Academy of Sciences, Lanzhou 730000, China;
    3. Gansu Datang New Energy Co., Ltd., Lanzhou 730070, China
  • Received:2019-01-15 Revised:2019-01-28 Published:2019-04-11

摘要: 调查了甘肃景泰荒漠草原区一处风电场基础设施建设和运行对植被的影响。结果表明:荒漠草原区百兆瓦级风力发电场建设造成直接植被生产力损失量为6.79 g·m-2·a-1,间接植被生产力损失量为91.43 g·m-2·a-1。随着扰动程度增加,物种丰富度降低,均匀度减小。在工程运行后,经历近10 a的自然恢复,核心扰动区虽然物种单一,但植被生产力是次级扰动区的两倍以上,为间接扰动区和未扰动区的50%和33%左右;而间接扰动区植被生产力仅为未扰动区的50%。总体上,风电工程扰动对区域植被的影响,不仅在于建设期对局地群落植被生产力的完全丧失,更重要的是在运行期间对周边大面积间接影响区群落植被生产力的大幅度降低,而且这种影响是长期和持续性的。

关键词: 风电场, 植被生产力, 生物多样性, 荒漠草原区

Abstract: The impact of infrastructure construction and operation of a wind farm on the vegetation was investigated in Jingtai County, Gansu Province, China. The results show that, the loss of direct vegetation productivity caused by the construction of 100MW wind farms in desert steppe region is 6.79 g·m-2·a-1, and the loss of indirect vegetation productivity is 91.43 g·m-2·a-1. As the degree of disturbance increases, the species richness decreases and the uniformity decreases. After the project running, about nearly 10 years of natural recovery, although the core disturbed zone has a single species, the vegetation productivity is more than twice that of the secondary disturbed zone, which is about 50% and 33% of the indirect disturbance zone and the undisturbed zone. The vegetation productivity in the indirect disturbed zone is only 50% of the undisturbed zone. In general, the impact of wind power project disturbance on regional vegetation is not only the complete loss of vegetation productivity in the local area during the construction period, but more importantly, the large scale reduction of vegetation productivity in the large area indirect affected area during the operation period, and this effects are long term and continuous.

Key words: wind farm, vegetation productivity, biodiversity, desert steppe region