img

官方微信

高级检索

中国沙漠 ›› 2020, Vol. 40 ›› Issue (2): 79-85.DOI: 10.7522/j.issn.1000-694X.2019.00106

• • 上一篇    下一篇

直压立式纱网沙障对近地表输沙量及风速的影响

闫德仁, 袁立敏, 黄海广, 胡小龙, 杨制国   

  1. 内蒙古自治区林业科学研究院, 内蒙古 呼和浩特 010010
  • 收稿日期:2019-11-13 修回日期:2019-12-11 出版日期:2020-03-20 发布日期:2020-04-26
  • 作者简介:闫德仁(1962-),男,内蒙古通辽人,研究员,博士,主要从事沙漠治理方面研究。E-mail:nmglkyydr@163.com
  • 基金资助:
    国家重点研发计划项目(2016YFC0501004)

Influence of gauze sand barrier on sediment transport and wind speed near surface

Yan Deren, Yuan Limin, Huang Haiguang, Hu Xiaolong, Yang Zhiguo   

  1. Inner Mongolia Academy of Forestry, Hohhot 010010, China
  • Received:2019-11-13 Revised:2019-12-11 Online:2020-03-20 Published:2020-04-26

摘要: 评价直压立式纱网沙障对流动沙地的固沙效果是其应用的前提。采用阶梯式集沙仪和HOBO风速仪野外测定了纱网沙障的输沙量及风速变化。结果表明:与对照相比,设置纱网沙障后,0~10 cm或0~20 cm高度范围内,带宽2、3、4、5 m带状沙障输沙量分别降低91.4%或89.7%、97.0%或96.4%、98.1%或96.7%、85.9%或84.2%;而2 m×2 m、3 m×3 m、 4 m×4 m、5 m×5 m网格沙障输沙量分别降低92.1%或91.2%、70.4%或65.6%、65.3%或65.2%、39.9%或30.0%。与对照相比,10、30、50 cm高度,带宽2、3、4 m带状沙障平均降低风速分别为26.7%、17.3%、11.8%,2 m×2 m、3 m×3 m、4 m×4 m、5 m×5 m网格沙障平均降低风速分别为55.3%、30.4%、23.0%。综合考虑,设置带宽3~4 m带状或网格纱网沙障能够满足工程固沙减少风沙危害的需求。

关键词: 沙障, 纱网沙障, 流动沙地, 输沙量, 风速

Abstract: It is a prerequisite for its application to evaluate the sand-fixing effect of gauze sand barriers in moving sandy land. The sediment discharge and change of wind speed of gauze sand barrier have been measured with step-type sand collector and HOBO anemometer in field. The results show that after establishing gauze sand barrier, compared with the control, the sediment discharge of 2 m, 3 m, 4 m and 5 m strip sand barriers in height range of 0-10 cm or 0-20 cm have decreased by 91.4% or 89.7%, 97.0% or 96.4%, 98.1% or 96.7%, 85.9% or 84.2%, respectively. And the sediment discharge of 2 m, 3 m, 4 m and 5 m grid sand barriers in height range of 0-10 cm or 0-20 cm have decreased by 92.1% or 91.2%, 70.4% or 65.6%, 65.3% or 65.2%, 39.9% or 30.0%, respectively. Compared with the control, at the height of 10 cm, 30 cm and 50 cm, 2-4 m strip sand barrier can averagely reduce the wind speed by 26.7%, 17.3% and 11.8%, and 2-5 m grid sand barrier can averagely reduce the wind speed by 55.3%, 30.4% and 23.0%. By comprehensive consideration, it can meet the needs of reducing the sand damage with sand-fixation engineering to establish 3-4 m strip or grid gauze sand barrier.

Key words: sand barrier, gauze sand barrier, moving sandy land, sediment transport, wind speed

中图分类号: